Remco Lam

My feedback

  1. 245 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Microsoft
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    planned  ·  10 comments  ·  Scheduler » Features  ·  Flag idea as inappropriate…  ·  Admin →
    Remco Lam supported this idea  · 
    An error occurred while saving the comment
    Remco Lam commented  · 

    I think the most important thing is to actually be able to schedule in timezone specific times. If a job should run at 1AM local time, I should not have to change the schedule during DST changes.

    What happens during a changeover is mostly a bonus. If a job would be run twice if it's run at 2.30 AM or not at all (depending on which changeover is a happening, than that is completely by design. This can be worked around on by not scheduling anything during the DST overlap period.

    Remco

Feedback and Knowledge Base